Installation Guide

How to Lay Gravel Grids

A complete ground preparation and installation guide. Covers excavation depth, sub-base specification, membrane layers, grid laying and gravel fill โ€” from bare ground to finished surface.

๐Ÿ—๏ธ
Suitable for
Driveways, car parks, pathways, equestrian areas and garden hardstanding
โฑ๏ธ
Time to complete
1โ€“2 days for a standard driveway. Allow time for sub-base material to be sourced and delivered.
๐Ÿ”‘
Key requirement
A properly compacted 150mm Type 1 sub-base is the most important part of the build.

What You Will Need

Have all materials on site before you start. Last-minute sourcing mid-job causes delays and cost overruns.

๐ŸŸซ
MOT Type 1 Sub-base
150mm compacted depth
Source locally via quarry or aggregate supplier
๐ŸŸง
Ground Reinforcement Grids
40mm depth ยท 4 per mยฒ
Available from Kent Groundwork Supplies
๐ŸŸช
Geotextile Membrane ร—2
Min. 100gsm non-woven
One below sub-base, one above
๐Ÿชจ
10mm Rounded Gravel
Fill depth ~40mm
Rounded, not angular
๐Ÿ“
Perimeter Edging
Height โ‰ฅ 40mm
Retains gravel at edges
โš™๏ธ
Plate Compactor
Hire if needed
Essential for sub-base compaction

The Layer Build-up

Every successful gravel grid installation follows the same layer sequence. Get this right and the surface will last for years. Skip or skimp on a layer and problems will follow.

~40mmGravel Fill10mm rounded gravel40mmGround Reinforcement Grids40mm plastic grid systemUpper Geotextile MembraneSeparation & weed membrane150mmMOT Type 1 Sub-baseCompacted crushed aggregateLower Geotextile MembraneSoil separation membraneNative GroundCompacted sub-gradeExcavate 200โ€“250mmโ† Finished surfaceCross-section illustration โ€” not to exact scale
150mm compacted Type 1 sub-base2ร— geotextile layers40mm reinforcement grids10mm rounded gravel fillTotal excavation 200โ€“250mm

Step-by-Step Installation

Follow these steps in order. Each one sets up the next โ€” there are no shortcuts.

1

Measure Up

Take the dimensions of the area you want to cover. For irregular shapes, break the area into rectangles and add them together. Calculate the total area in square metres (mยฒ). You need 4 grids per mยฒ.

2

Order Your Materials

Before you dig, have everything ready on site. You will need: ground reinforcement grids, geotextile membrane (two pieces โ€” one for below the sub-base and one above it), MOT Type 1 aggregate for the sub-base, 10mm rounded gravel to fill the grid cells, and perimeter edging to keep the gravel contained.

โ†’Order around 5โ€“10% extra on grids and gravel to allow for cuts and waste.
3

Excavate to Depth

Dig out the area to a total depth of 200โ€“250mm from your intended finished surface level. The exact depth depends on ground conditions โ€” soft or clay-heavy ground should be excavated deeper. Remove all topsoil, vegetation roots, and loose material. The exposed sub-grade should be firm and consistent.

Note:If the sub-grade is soft or poorly drained, compact it before proceeding. Weak spots at this stage will cause the surface to fail later.
4

Lay the Lower Geotextile

Roll out the first geotextile membrane across the full excavated area, taking it up the sides of the excavation. Overlap any joins by at least 300mm. This membrane separates the native ground from the sub-base, prevents soil migration upwards, and helps distribute load. Use a non-woven geotextile with a minimum weight of 100gsm.

5

Install and Compact the Sub-base

Spread MOT Type 1 aggregate evenly over the lower geotextile to a compacted depth of 150mm. Work in layers if needed โ€” no more than 75mm loose depth at a time. Compact each layer thoroughly using a plate compactor. Check for level as you go: the finished sub-base surface must be flat and even, as the grids will follow it exactly.

โ†’150mm compacted depth of MOT Type 1.
Note:Do not skip compaction or rely on foot traffic alone. An under-compacted sub-base is the most common cause of a failing gravel surface.
6

Lay the Upper Geotextile

Once the sub-base is compacted and level, roll out the second geotextile membrane on top. This separates the sub-base from the gravel fill above, preventing fine aggregate from migrating down into the Type 1 over time. Overlap joins by at least 300mm. A woven or non-woven geotextile is suitable for this layer.

7

Lay the Grids

Starting from one corner, click the grid panels together and work across the area in rows. The panels connect on all four sides. Use perimeter edging or border restraints around the entire edge of the installation to prevent gravel from spreading out from under the grid. Cut panels to fit edges and curves using a saw or angle grinder. The grids should sit flat and firm on the upper geotextile.

8

Fill with Gravel

Fill the grid cells with 10mm rounded (not angular) gravel. Rounded gravel flows into the cells and beds down evenly. Angular stone can bridge across cells and leave voids underneath, leading to uneven wear. Fill to the top of the grid โ€” approximately 40mm of gravel. Rake or brush level.

โ†’10mm rounded gravel. Fill flush with the top of the grid.
Note:Expect some settlement after initial use. Top up with a thin layer of gravel after the first week of use to restore a flush, even surface.

Tips for a Professional Finish

The difference between a surface that lasts a few years and one that lasts twenty usually comes down to these details.

๐Ÿ“

Check levels constantly

An uneven sub-base will produce an uneven finished surface. Use a long straight-edge and spirit level at every stage โ€” not just at the end.

๐ŸŒง๏ธ

Plan for drainage

Gravel grids are permeable โ€” water passes straight through. But the site below still needs to drain. If the ground is slow to drain, consider a drainage solution before laying the sub-base.

๐Ÿš—

Vehicle loads need full depth

For driveways and car parks, never reduce the sub-base below 150mm. For heavy vehicles (vans, lorries), consider 200mm of Type 1. The sub-base is what takes the load โ€” the grid simply holds the gravel in place.

โœ‚๏ธ

Cutting grids

Use an angle grinder or circular saw to cut grid panels. Mark cut lines with a marker pen first. Work on a flat surface and protect the cut edge with edging strip if it will be exposed.

Quick Reference

Key specifications at a glance.

ItemSpecification
Sub-base materialMOT Type 1 (Type 2 or 3 also acceptable)
Sub-base depth150mm compacted
Geotextile layers2 โ€” one below, one above sub-base
Total excavation200โ€“250mm from finished surface level
Grid depth40mm
Gravel fill size10mm rounded gravel
Grids per mยฒ4

Ready to start?

We stock ground reinforcement grids and geotextile membrane here in Goudhurst, Kent. Available for same-day collection or local delivery within 25 miles. Talk to Simon directly for quantities, pricing, and advice on your specific job.

โœ…
Gravel grids in stock
Ready for collection today or delivery this week
โœ…
Geotextile membrane available
Non-woven and woven options in stock
โœ…
Free advice included
Talk to Simon about your specific project before ordering